PPC Budget | # Keywords | # Overlap kw | ||
---|---|---|---|---|
olympiabuildings.com | $12,475 | 3,374 | 96 | Learn More |
futurebuildings.com | $5,970 | 2,175 | 89 | Learn More |
armstrongsteelbuildings.com | $3,190 | 1,815 | 59 | Learn More |
lincolnsteelbuildings.com | $1,333 | 1,220 | 54 | Learn More |
americansteelspan.com | $5,187 | 1,961 | 52 | Learn More |
Organic Listings | 1st Page Keywords | Avg Pos | Pos Trend | Est.Traffic | Traffic Value | |
---|---|---|---|---|---|---|
Toro Steel Buildings: Pre Engineered Steel & Metal Building Canada https://www.torosteelbuildingsToro Steel Buildings is a lead | 224 | 9.35 ( 0.28 ) | 98160 | $2,497 | ||
Keyword | Position | Trend | Search Vol | CPC | ||
pre manufactured steel structures | 2 | 0 | N /A | |||
pre engineered steel building | 2 ( 1 ) | 50 | $6.4 | |||
pre fab metal garages | 4 | 0 | N /A | |||
metal building steel | 5 ( 10 ) | 10 | $2.05 | |||
metal builders | 5 | 30 | $4.32 | |||
A Guide to Prefabricated Steel Buildings Commercial Steel Buildings ... https://www.torosteelbuildingsPrefabricated steel buildings | 60 | 7.82 ( 3.04 ) | 5410 | $248 | ||
Keyword | Position | Trend | Search Vol | CPC | ||
prefabricated steel | 3 | 10 | $2.8 | |||
prefabricated metal buildings | 4 ( 3 ) | 260 | $3.39 | |||
steel prefab building | 5 ( 3 ) | 40 | $5.4 | |||
prefab metal storage buildings | 6 ( 3 ) | 20 | $2.85 | |||
prefabricated metal | 7 ( 6 ) | 10 | N /A | |||