PPC Budget | # Keywords | # Overlap kw | ||
---|---|---|---|---|
dektektile.com | $12 | 87 | 2 | Learn More |
highconcrete.com | $74 | 54 | 1 | Learn More |
blog.advantagelumber.com | $1,051 | 205 | 1 | Learn More |
buildwithhsc.com | $1,049 | 223 | 1 | Learn More |
advantagelumber.com | $2,604 | 1,329 | 1 | Learn More |
Organic Listings | 1st Page Keywords | Avg Pos | Pos Trend | Est.Traffic | Traffic Value | |
---|---|---|---|---|---|---|
Accelerated Bridge Construction, Installation & Replacement ... - bgfma http://www.bgfma.org/techinfo.Accelerated bridge replacement | 1 | 20 | N/A | $0 | ||
Keyword | Position | Trend | Search Vol | CPC | ||
prefabricated bridge manufacturers | 20 | 0 | N /A | |||
Bridge Grid Flooring Manufacturers Association(BGFMA) The role of the association is | 7 | 3 ( 1.5 ) | 140 | $0 | ||
Keyword | Position | Trend | Search Vol | CPC | ||
steel grid deck | 3 | 20 | $0.99 | |||
steel grid | 6 ( 2 ) | 90 | $2.25 | |||
steel bridge decking | 20 | 20 | $3.93 | |||
steel grid bridge deck | 1 | 0 | N /A | |||
steel grid decking | 2 | 0 | N /A | |||
precast concrete decking | abc. org | concrete decking | precast concrete deck panels | abc org |
Concrete Bridge Decks Precast concrete bridge decks help accelerate bridge replacement time. Long-Term Performance. Lightweight. Lower Life-Cycle Cost. www.bgfma.org/ ABC Bridge Decks - BGFMA.org Accelerated bridge replacement with prefabricated decking systems. Lightweight. Long-Term Performance. Lower Life-Cycle Cost. www.bgfma.org/ ABC Bridge Decks - BGFMA.org Accelerated bridge replacement with prefabricated decking systems. Long-Term Performance. Lightweight. Lower Life-Cycle Cost. www.bgfma.org/ |